Bengaluru: Three Metro stations with multi-modal facilities is all set to come up at Hebbal here.
Three lines are Outer Ring Road (Silk Board – KR Puram) – Kempegowda International Airport (KIA), ORR West Metro (Hebbal to JP Nagar), and Sarjapura – Hebbal, and the three metro stations are all within a 500-metre radius. “Of the three, two will be elevated and one will be underground. All the three stations will be linked with escalators.
It is learnt that the DPR preparation will take 1 to 1.5 years, and then the construction will take 4 to 5 years.