Bengaluru: The proposed Bengaluru–Mangaluru–Madgaon Vande Bharat Express is expected to improve rail connectivity between Bengaluru and coastal Karnataka. However, its long journey time to Goa has raised questions about whether the service will offer a meaningful time advantage for passengers travelling to Madgaon.
The new train, approved by the Railway Board, will connect Yesvantpur in Bengaluru with Madgaon in Goa through Hassan, Sakleshpur, Mangaluru and several coastal destinations. While passengers travelling between Bengaluru and Mangaluru are expected to benefit from a faster connection, those travelling all the way to Goa will have to spend more than 13 hours on the train.
Bengaluru–Mangaluru journey to become faster
The new Vande Bharat service is expected to cover the Bengaluru–Mangaluru route in less than eight hours. This would make it faster than other trains currently operating on this route and provide an additional daytime travel option for passengers.
The train will pass through Hassan and Sakleshpur before entering the coastal region. It will then serve important destinations such as Mangaluru, Udupi and Kundapura.
The service is expected to benefit people travelling for work, education, business and tourism between Bengaluru and the coastal districts.
Goa journey to take over 13 hours
While the service is expected to offer a quicker connection to Mangaluru, the journey from Yesvantpur to Madgaon is scheduled to take approximately 13 hours and 20 minutes.
The return journey from Madgaon to Yesvantpur will take around 12 hours and 55 minutes. The long duration has drawn attention to the operating constraints along the route, particularly through the Western Ghats.
The train’s average speed is expected to be around 53–54 kmph, making it one of the slowest Vande Bharat chair-car services in the country in terms of average speed.
Ghat section poses speed restrictions
One of the major challenges is the railway section between Sakleshpur and Subrahmanya Road. The approximately 55-km ghat stretch has difficult terrain and operational restrictions.
For safety reasons, trains are permitted to travel at a maximum speed of around 30 kmph through this section. These restrictions will affect the overall journey time despite the Vande Bharat train’s ability to operate at higher speeds on suitable sections.
The route also has substantial single-line sections. Trains need to accommodate crossing requirements, which can add waiting time and affect the overall schedule.
Train route and stoppages
The Yesvantpur–Madgaon Vande Bharat Express will operate as train numbers 26655 and 26656. It will have 12 intermediate stoppages across Karnataka before reaching Goa.
The stations are:
- Shravanabelagola
- Hassan
- Sakleshpur
- Subrahmanya Road
- Kabaka Puttur
- Mangaluru Junction
- Udupi
- Kundapura
- Mookambika Road Byndoor
- Murdeshwar
- Gokarna Road
- Karwar
The inclusion of Kabaka Puttur follows passenger demand for a stoppage at the station. The service will provide direct connectivity to several coastal destinations without requiring passengers to change trains.
Operating schedule
Train No. 26655 will depart from Yesvantpur at 7.35 am and reach Madgaon at 8.55 pm. It will operate six days a week, except Wednesdays.
In the return direction, Train No. 26656 will leave Madgaon at 8.20 am and arrive at Yesvantpur at 9.15 pm. This service will operate six days a week, except Thursdays.
Existing Mangaluru–Madgaon service to be replaced
The new Bengaluru–Madgaon service is expected to replace the existing Mangaluru Central–Madgaon Vande Bharat Express, operating as train numbers 20645 and 20646.
The revised service will extend the connection to Bengaluru while retaining links to important coastal destinations. The new route is expected to serve passengers travelling between Bengaluru, coastal Karnataka and Goa.
The official commencement date and ticket fares had not been announced in the reports available as of November 10, 2026. Passengers are advised to check official railway updates before making travel plans.
