Mangaluru: Toll collection has commenced on the newly widened four-lane Mangaluru-Bengaluru National Highway 75 (NH 75) between B.C. Road and Addahole at Valalu Toll Plaza near Uppinangady in Dakshina Kannada district from November 26.

The National Highways Authority of India (NHAI) notified the commencement of toll collection on Wednesday, November 25. The 65-km highway stretch, developed under the engineering, procurement and construction (EPC) model by two contractors, has been reduced to 63.6 km following the straightening of curves at several locations.

Road users travelling from B.C. Road towards Addahole and further to Hassan and Bengaluru will now have to pay the notified user fee at the Valalu Toll Plaza.

NH 75 toll charges at Valalu Toll Plaza

NHAI has fixed the toll charges for different vehicle categories at the newly operational toll plaza. The rates for a single journey and a return journey within 24 hours are as follows:

Vehicle categorySingle journeyReturn journey
Car, van and light motor vehicleRs 140Rs 205
Light commercial vehicleRs 220Rs 335
Two-axle bus or truckRs 465Rs 700
Three-axle commercial vehicleRs 510Rs 760
Heavy construction vehicleRs 730Rs 1,095
Oversized vehicleRs 890Rs 1,335

The toll rates apply to vehicles using the designated highway section, with return-trip charges applicable within the stipulated 24-hour period.

Monthly passes and concessions for commuters

NHAI has introduced various pass options and concessions for regular commuters and eligible vehicle owners using the highway.

A monthly pass offering 50 single trips is available with a one-third concession on the applicable toll rates for eligible vehicle categories. Commercial vehicles registered in the district where the toll plaza is located are also eligible for a 50 per cent concession, subject to applicable conditions.

For local commuters, a monthly pass costing Rs 360 will be available for cars, vans and light motor vehicles used for personal local travel.

Private light motor vehicle owners residing within 20 km of the toll plaza can also obtain an annual local pass for Rs 1,500, according to NHAI.

The nationwide annual FASTag pass for eligible private cars, jeeps and vans, offering 200 single trips at covered toll plazas, will continue to be available for Rs 3,075 for the financial year 2026-27.

Kalladka flyover and other highway infrastructure

The four-lane B.C. Road-Addahole highway project includes several infrastructure components aimed at improving traffic movement and reducing congestion along the Mangaluru-Bengaluru route.

The project features a 3-km elevated road at Kalladka, a vehicular overpass-cum-flyover at Nellyadi and vehicular overpasses at Panemangaluru, Melkar, Mani, Uppinangady and Subrahmanya Cross.

A grade separator has also been constructed at Dharmasthala Cross, near Periyashanthi, as part of the highway development project.

However, around 500 metres of the highway at Neerakatte and approximately 300 metres near Rekya were still under construction when toll collection was announced.

Four-lane highway development on NH 75

The Union Road Transport Ministry had assigned 47.5 km of the highway between Hassan and Maranahalli, near Sakleshpur, in Hassan district, and 65 km of the Addahole-B.C. Road stretch in Dakshina Kannada district to NHAI on July 8, 2016, for four-lane development.

The highway was developed to improve connectivity between the coastal region and Bengaluru through Hassan and Sakleshpur.

Toll collection at the Chowlagere Toll Plaza on the Hassan-Maranahalli section of NH 75 had already commenced approximately two years ago.

With toll collection now beginning at Valalu Toll Plaza, motorists travelling on the B.C. Road-Addahole stretch will have to factor the new charges into their travel expenses.